Dear,

I've installed KEIL 5.0 in addition of my current version of KEIL 4 (4.71a) in a different directory.
Even if I ask windows to open projects (uvproj) with KEIL 4, it opens it with KEIL 5.

I'm doing that because I want to evaluate KEIL 5 with not critical projects and continue to work with KEIL 4 for the others.

Is there a way to do that (it was possible with KEIL 3 and 4) ?